HEAD I |
HEAD II |
HEAD IV |
HEAD V |
HEAD VI |
CIVIL ENGINEERING WORKS |
BUILDING WORKS |
OTHER SPECIALIST CIVIL ENGINEERING |
QUARRYING METAL AND EARTH SUPPLY, CARTAGE AND TRANSPORT |
FOREST AND LAND |
Sub-Head 1 |
Sub-Head 1 |
Sub-Head 1 |
Sub-Head 3 |
Sub-Head 2 |
General Civil Engineering Works |
Building Works Excluding Reinforced Concrete Frame Structures |
Earthworks |
Earth Supply |
Jungle Clearing and Land Preparations |
Sub-Head 2 |
Sub-Head 2 |
Sub-Head 2 |
Sub-Head 4 |
|
Bridges, Jetties & Marine Structures |
a) Reinforced Concrete Frame Building Not Exceeding Four Storeys in Height
b) Reinforced Concrete Frame Building Exceeding Four Storeys in Heights |
In-Situ Concrete
Precast, Reinforced Concrete Steel
|
Cartage and Transport |
|
Sub-Head 3 |
Sub-Head 5 |
Sub-Head 3 |
|
|
a) Water Retaining Structures |
Steel Frame Buildings |
Asphaltic Coatings
Bituminous Road
Road Signs and Road Paintings
Guard Rails Barriers, Milestone, etc., For Roads
|
|
|
Sub-Head 5 |
Sub-Head 7 |
Sub-Head 4 |
|
|
Sewerage Systems |
Other Floor And Wall Finished |
(a) Steelwork |
|
|
Sub-Head 7 |
Sub-Head 8 |
Sub-Head 5 |
|
|
Irrigation, Drainage and Flood Control Works
(a) Hydraulic Structures
(b) Earthworks |
Maintenance Works
a) Maintenance of Sanitary Systems
b) Repainting and General Repairs of Buildings |
Sub-Soil Drainage |
|
|
|
|
Sub-Head 6 |
|
|
|
|
Water Mains |
|
|
|
|
Sub-Head 7 |
|
|
|
|
Precast Reinforced or Non-Reinforced Concrete Beams, Kerbs, Culverts, and Drains |
|
|